# Budgeted value

> Budgeted value is the total of all budgets across priced briefs: fixed budgets as written plus the index's estimate for hourly briefs. It measures what buyers offered for AI work, not what was finally paid.

Also called: total budgeted value, posted value, total budget, market value of briefs. Category: Measuring the index. Source: https://aibuildindex.com/glossary/budgeted-value

## In the index

- All AI builds: median $2,500, middle half $500 to $7,200, 38,732 priced briefs (https://aibuildindex.com/pulse)

Counting briefs shows how often buyers ask for a build. Budgeted value shows where the money goes. It adds up the budgets of every [priced brief](https://aibuildindex.com/glossary/priced-brief) in a group, so a single large brief weighs as much as many small ones combined. The [market report](https://aibuildindex.com/pulse) uses it to show which build types, budget bands and countries carry the most money, which is often a different picture from which ones are most common.

## How the index uses it

Each priced brief contributes its budget: fixed-price briefs at the amount the buyer stated, and hourly briefs at their [hourly estimate](https://aibuildindex.com/glossary/hourly-estimate), calculated from rate, length and workload. The total across a group is its budgeted value.

The index then compares shares. For any slice of the market, such as a use case, a budget band or a country, it can show two numbers side by side: its share of priced briefs and its share of budgeted value. When the second is larger than the first, that slice carries more money than its volume suggests. When it is smaller, the slice is busy but low in value.

The report also uses budgeted value to measure concentration, such as how much of the total sits in the largest 10% of briefs. That links it to the [top-10%](https://aibuildindex.com/glossary/top-ten-percent) idea, but from the angle of total money rather than a single cut-off.

## What it means for cost

Budgeted value is a market measure, not a buyer's price. It helps answer questions such as which kinds of AI work attract the largest budgets, or whether a type of build is mostly small jobs with a few large ones. For a buyer, that context explains why quotes for some builds vary so much: when value is concentrated in a few large projects, the label covers very different scopes.

Three limits apply, all set out in the [methodology](https://aibuildindex.com/methodology):

- It is what briefs offered, not what was paid. Final contracts can differ.
- Hourly briefs are estimated with assumptions that lean towards the upper side of the market.
- Public briefs lean towards smaller, open-market projects and do not measure enterprise spending.

So budgeted value describes the open market seen through public briefs, not total spending on AI.

## Common questions

### Is budgeted value the same as market size?

No. It covers only the priced briefs the index collected in its window, which are public, mostly smaller projects. It says nothing about private contracts, enterprise programmes or in-house spending. Use it to compare parts of the market with each other, not to size the whole.

### Why does a build type with few briefs sometimes have a large budgeted value?

Because a few large budgets can outweigh many small ones. Comparing a build's share of briefs with its share of budgeted value shows whether it is a high-volume, low-budget category or a less common one with larger projects.

## Related terms

- [Priced brief](https://aibuildindex.com/glossary/priced-brief): A priced brief is a project brief the AI Build Index can turn into a cost: a fixed-price brief with a stated budget, or an hourly brief with a rate and expected length, within the index's floor and ceiling.
- [Hourly estimate](https://aibuildindex.com/glossary/hourly-estimate): An hourly estimate is the total cost the AI Build Index calculates for an hourly brief: the midpoint of the stated rate, times the expected length in months, times assumed hours per month.
- [Top 10% (90th percentile)](https://aibuildindex.com/glossary/top-ten-percent): The top 10% figure is the 90th percentile of priced briefs: the budget that only one in ten buyers planned to exceed. The AI Build Index uses it to show how high the upper end of a build's market reaches.
- [Median cost](https://aibuildindex.com/glossary/median-cost): The median cost is the middle value when all priced briefs for a build are sorted from lowest to highest budget, so half budget less and half more. It is the headline figure on each AI Build Index page.
- [Project brief](https://aibuildindex.com/glossary/project-brief): A project brief is a written description of work a business wants done, setting out the problem, the scope and usually a budget or rate. Public project briefs are the primary source of the AI Build Index.
