# Hourly estimate

> An hourly estimate is the total cost the AI Build Index calculates for an hourly brief: the midpoint of the stated rate, times the expected length in months, times assumed hours per month.

Also called: estimated hourly cost, hourly brief estimate, rate-based estimate, implied project cost. Category: Measuring the index. Source: https://aibuildindex.com/glossary/hourly-estimate

## In the index

- All AI builds: median $2,500, middle half $500 to $7,200, 38,732 priced briefs (https://aibuildindex.com/pulse)

Many buyers do not state a total budget. They state an [hourly rate](https://aibuildindex.com/glossary/hourly-rate) range, how long they expect the work to take and how many hours a week they need. To put those briefs on the same scale as fixed budgets, the index estimates a total for each. That estimate is a calculation from the buyer's own figures and a few fixed assumptions, not a figure the buyer wrote, and not a quote.

## How the index uses it

The [methodology](https://aibuildindex.com/methodology) sets out the formula: the midpoint of the stated rate, times the expected length, times assumed hours.

Expected length is read from the brief and converted to months:

- under 1 month counts as 0.5 months
- 1 to 3 months counts as 2
- 3 to 6 months counts as 4.5
- over 6 months counts as 6

Hours depend on the workload the buyer asks for. Briefs asking for more than 30 hours a week count as 160 hours a month; all others count as 80.

A worked example: a brief with a rate range, an expected length of 1 to 3 months and a part-time workload is estimated as the midpoint of that range, times 2 months, times 80 hours. The same brief marked as more than 30 hours a week would use 160 hours instead, doubling the estimate.

Hourly briefs with no rate or no expected length cannot be estimated and are left out of ranges. Estimated briefs must fall within the same floor and ceiling as fixed budgets, after which they become [priced briefs](https://aibuildindex.com/glossary/priced-brief) alongside them.

## What it means for cost

These assumptions are the index's own, and they treat the work as running its full expected length at the assumed hours. Real hourly projects often end sooner or use fewer hours. So hourly estimates should be read as the upper side of the market, and figures on pages with many hourly briefs lean that way too.

For a buyer, the formula is also a useful check on any [time and materials](https://aibuildindex.com/glossary/time-and-materials) quote. Multiply the builder's rate by a realistic number of hours per month and by the expected months, and see where the total lands against the page's range. If a builder's estimate of hours differs sharply from that, ask why.

## Common questions

### Why does the index estimate totals for hourly briefs instead of leaving them out?

Hourly work is a large part of the market, and leaving it out would bias the figures towards fixed-price projects. Estimating totals with stated assumptions keeps those briefs in, while making clear how the number was produced.

### Are hourly estimates accurate?

They are consistent rather than precise. Every hourly brief is converted the same way, so they can be compared, but the assumed hours and full-length duration mean they tend to sit above what many hourly projects actually cost.

### What does 160 hours a month mean?

It is the index's assumption for full-time work, used when a brief asks for more than 30 hours a week. All other hourly briefs are treated as half that, 80 hours a month.

## Related terms

- [Hourly rate](https://aibuildindex.com/glossary/hourly-rate): An hourly rate is the price a builder charges for each hour of work, used in time-and-materials contracts, where the final cost depends on how many hours the project actually takes.
- [Priced brief](https://aibuildindex.com/glossary/priced-brief): A priced brief is a project brief the AI Build Index can turn into a cost: a fixed-price brief with a stated budget, or an hourly brief with a rate and expected length, within the index's floor and ceiling.
- [Time and materials (hourly)](https://aibuildindex.com/glossary/time-and-materials): Time and materials is a contract model in which the buyer pays for the hours actually worked at an agreed rate, plus any direct costs, rather than a fixed total for a defined scope.
- [Budgeted value](https://aibuildindex.com/glossary/budgeted-value): Budgeted value is the total of all budgets across priced briefs: fixed budgets as written plus the index's estimate for hourly briefs. It measures what buyers offered for AI work, not what was finally paid.
- [Median cost](https://aibuildindex.com/glossary/median-cost): The median cost is the middle value when all priced briefs for a build are sorted from lowest to highest budget, so half budget less and half more. It is the headline figure on each AI Build Index page.
- [Seniority level](https://aibuildindex.com/glossary/seniority-level): Seniority level is the experience a buyer asks for in a project brief: junior, mid-level or senior. The AI Build Index uses it to compare costs and hourly rates by the level of builder requested.
