# Statement of work (SOW)

> A statement of work is a contract document that sets out exactly what a builder will deliver, how and when, how acceptance will be judged, what it costs and what is excluded.

Also called: SOW, scope of work, project scope document, work order. Category: Pricing and contracts. Source: https://aibuildindex.com/glossary/statement-of-work

A statement of work, or SOW, turns an agreed idea into an enforceable plan. It sits alongside a general services agreement and describes one specific project: the deliverables, timeline, milestones, price, responsibilities on both sides and the test for "done". For AI and automation work, a good SOW is the single best defence against disputes about what was promised.

## How it works

A useful SOW for an AI build usually covers:

- **Objectives and deliverables.** What will exist at the end: workflows, an app, integrations, documentation, training.
- **Assumptions and dependencies.** Access to systems, sample data, API availability and the buyer's response times.
- **Acceptance criteria.** How each deliverable will be tested, including accuracy measures on an agreed test set where a model is involved.
- **Milestones and payment.** Usually linked to [milestone payments](https://aibuildindex.com/glossary/milestone-payment).
- **Exclusions.** What is not included, such as model usage fees, ongoing support or data cleaning beyond a set amount.
- **Change process.** How [change requests](https://aibuildindex.com/glossary/change-request) are raised, priced and approved.

An example clause for a lead-scoring build might say that the model will score inbound leads into three tiers, measured against 200 historical leads labelled by the sales team, with a minimum match rate set in the document as the acceptance test.

## What it means for cost

The SOW is where price and scope are tied together, so its quality directly affects cost:

- **Precision prevents rework.** Clear inputs, outputs and acceptance tests reduce argument and rework later.
- **Assumptions shift risk.** Each assumption, such as "the buyer provides clean data", moves risk back to the buyer if it fails. Read them closely.
- **Exclusions show running costs.** Licences, usage fees and support are often excluded; budget for them separately.
- **Ownership.** Confirm the SOW or master agreement covers [IP ownership](https://aibuildindex.com/glossary/ip-ownership) of code, prompts and trained models.

Writing a SOW properly often takes a short [discovery phase](https://aibuildindex.com/glossary/discovery-phase). For a [fixed-price contract](https://aibuildindex.com/glossary/fixed-price-contract), it is essential.

## Common questions

### Who writes the statement of work?

Usually the builder drafts it, since they know what they are pricing, and the buyer reviews and edits. Larger organisations sometimes provide their own template. Either way, both sides should read every assumption and exclusion.

### Can a statement of work change after signing?

Yes, through the change process it defines. Changes are written up, priced and signed as amendments, so the record of what was agreed stays clear.

### Is a project brief the same as a statement of work?

No. A brief describes what the buyer wants and invites responses. A SOW is the agreed, detailed plan that follows once a builder is chosen.

## Related terms

- [Fixed-price contract](https://aibuildindex.com/glossary/fixed-price-contract): A fixed-price contract is an agreement in which the builder delivers a defined scope of work for a total price agreed in advance, so the buyer's cost stays the same unless the scope changes.
- [Milestone payment](https://aibuildindex.com/glossary/milestone-payment): A milestone payment is a portion of a project's price released when a defined stage of work is delivered and accepted, spreading payment across the project instead of paying everything upfront or at the end.
- [Change request](https://aibuildindex.com/glossary/change-request): A change request is a formal proposal to alter an agreed project's scope, timeline or requirements, written up with its effect on price and schedule so both sides can approve it before work begins.
- [Discovery phase](https://aibuildindex.com/glossary/discovery-phase): A discovery phase is a short, paid stage before a build in which a builder studies the buyer's process, data and systems to define scope, test feasibility, and produce a reliable plan and estimate.
- [User acceptance testing (UAT)](https://aibuildindex.com/glossary/user-acceptance-testing): User acceptance testing (UAT) is the final check before go-live in which the buyer's own staff use the system on realistic tasks to confirm it does what the business needs and meets the agreed acceptance criteria.
- [IP ownership](https://aibuildindex.com/glossary/ip-ownership): IP ownership is the question of who holds the legal rights to what a build produces, such as the code, prompts, trained models, datasets and documentation, once the work is delivered and paid for.