# Time and materials (hourly)

> Time and materials is a contract model in which the buyer pays for the hours actually worked at an agreed rate, plus any direct costs, rather than a fixed total for a defined scope.

Also called: T&M, hourly contract, hourly billing, pay by the hour, time-based contract. Category: Pricing and contracts. Source: https://aibuildindex.com/glossary/time-and-materials

Under time and materials, often shortened to T&M, the buyer pays for the work as it happens: hours logged at an agreed [hourly rate](https://aibuildindex.com/glossary/hourly-rate), plus materials such as software licences or cloud costs passed through at cost. It suits work where the scope cannot be pinned down at the start, which is common in AI projects that depend on untested data or evolving requirements.

## How it works

The contract sets the rates, how time is recorded and reported, the billing cycle and usually a cap or budget alert. Agencies may quote a [blended rate](https://aibuildindex.com/glossary/blended-rate) across senior and junior staff. Work is planned in short cycles, and the buyer can change priorities between them without renegotiating the contract.

A typical case is improving an existing AI support assistant. The team does not know in advance which fixes will lift accuracy most, so they work in two-week cycles: measure, change retrieval or prompts, measure again, and report. The buyer sees progress and spend every cycle and can stop when results are good enough.

In the index, hourly briefs have no stated total, so the [methodology](https://aibuildindex.com/methodology) estimates one from the stated rate, expected length and assumed hours. That [hourly estimate](https://aibuildindex.com/glossary/hourly-estimate) is a calculation, not a quote, and leans towards the upper side of the market.

## What it means for cost

Time and materials moves risk from the builder to the buyer, in exchange for flexibility:

- **No risk margin.** The rate does not need a buffer for unknowns, so well-run projects can cost less than a fixed price.
- **Open-ended spend.** Without a cap and regular reports, costs can drift. Set a not-to-exceed figure and review weekly or fortnightly.
- **Buyer effort.** The buyer must stay involved to steer priorities, which takes their own time.
- **Change is cheap.** New ideas do not need formal change requests, though they still add hours and can turn into [scope creep](https://aibuildindex.com/glossary/scope-creep).

What to ask: how time is logged, what reports you will see, and what the builder expects the total to be under normal conditions.

## Common questions

### How do I control costs on an hourly project?

Agree a budget cap, a reporting rhythm and a short list of priorities. Ask for an estimate of each piece of work before it starts, and compare actual hours with estimates at every review.

### When is time and materials better than a fixed price?

When requirements are likely to change, the data is unknown, or the work is ongoing improvement rather than a defined delivery. Once the scope is clear, switching to a [fixed-price contract](https://aibuildindex.com/glossary/fixed-price-contract) for the build phase is common.

## Related terms

- [Fixed-price contract](https://aibuildindex.com/glossary/fixed-price-contract): A fixed-price contract is an agreement in which the builder delivers a defined scope of work for a total price agreed in advance, so the buyer's cost stays the same unless the scope changes.
- [Hourly rate](https://aibuildindex.com/glossary/hourly-rate): An hourly rate is the price a builder charges for each hour of work, used in time-and-materials contracts, where the final cost depends on how many hours the project actually takes.
- [Hourly estimate](https://aibuildindex.com/glossary/hourly-estimate): An hourly estimate is the total cost the AI Build Index calculates for an hourly brief: the midpoint of the stated rate, times the expected length in months, times assumed hours per month.
- [Retainer](https://aibuildindex.com/glossary/retainer): A retainer is an ongoing arrangement in which a buyer pays a builder a regular fee, usually monthly, for a reserved amount of time or a defined service, such as maintenance, improvements or on-call support.
- [Blended rate](https://aibuildindex.com/glossary/blended-rate): A blended rate is a single hourly or daily price a team or agency charges for all its people on a project, averaging senior and junior time into one figure instead of billing each role separately.
- [Scope creep](https://aibuildindex.com/glossary/scope-creep): Scope creep is the gradual growth of a project beyond what was originally agreed, through added features, changed requirements or unplanned work, usually without a matching change to budget or timeline.