# Top 10% (90th percentile)

> The top 10% figure is the 90th percentile of priced briefs: the budget that only one in ten buyers planned to exceed. The AI Build Index uses it to show how high the upper end of a build's market reaches.

Also called: 90th percentile, P90, top decile, high end, upper end of the market. Category: Measuring the index. Source: https://aibuildindex.com/glossary/top-ten-percent

## In the index

- All AI builds: median $2,500, middle half $500 to $7,200, 38,732 priced briefs (https://aibuildindex.com/pulse)

The middle of the market tells a buyer what is typical. The top 10% figure tells them what ambitious looks like. It is the 90th [percentile](https://aibuildindex.com/glossary/percentile) of [priced briefs](https://aibuildindex.com/glossary/priced-brief): nine in ten budgets for a build sit below it, one in ten above. Shown next to the [median](https://aibuildindex.com/glossary/median-cost) and the [middle half](https://aibuildindex.com/glossary/middle-half), it gives a sense of how far the market stretches when buyers want something larger, more complex or more polished.

## How the index uses it

The [methodology](https://aibuildindex.com/methodology) defines the figure plainly: the band is the 25th to 75th percentile, the marker is the median, and the top-10% figure is the 90th percentile. Like the other figures, it needs at least 10 priced briefs on a page, and pages with fewer than 15 carry a small-sample note.

The index uses the 90th percentile rather than the maximum because the maximum is a single brief and can be anything: a large programme, a misread scope or an unusual one-off. The 90th percentile reflects a group of high-budget briefs, so it moves less when one large brief arrives. On a page with few priced briefs, though, it is still the most sensitive of the published figures, because only a handful of briefs sit above it.

The [market report](https://aibuildindex.com/pulse) also looks at the top tenth from another angle: how much of all [budgeted value](https://aibuildindex.com/glossary/budgeted-value) sits in the largest 10% of briefs. That shows how concentrated spending is, which a median alone cannot.

## What it means for cost

The gap between the median and the top 10% shows how varied a build type is. A small gap means most projects of that type are similar in size. A large gap means the label covers everything from small add-ons to substantial systems, so a buyer should look closely at what their own scope includes before deciding where it belongs.

A quote near or above the 90th percentile is not automatically too high. Builds that connect several systems, handle regulated data, need production-grade testing or use senior teams often land there. But it is a signal to ask:

- Which parts of the scope push this above most comparable budgets?
- Could a smaller first phase deliver most of the value?
- Is this priced as a production system, while comparable briefs were for pilots?

Remember that each figure is an opening budget in a public brief, and that agencies building production systems usually price above the open-market middle.

## Common questions

### Why not show the highest budget instead?

The single highest budget is often unrepresentative. One very large brief could make a build type look far more expensive than it is for almost everyone. The 90th percentile shows the upper end while staying grounded in a group of briefs.

### What kinds of projects sit in the top 10%?

Usually those with a broader scope: more integrations, more users, stricter security or compliance, longer timelines or more senior teams. The index reports budgets, not reasons, so the brief behind a high budget is what explains it.

## Related terms

- [Percentile](https://aibuildindex.com/glossary/percentile): A percentile is the value below which a given share of a sorted set falls. The 25th percentile of budgets is the figure a quarter of priced briefs sit below; the index builds its ranges from percentiles.
- [Middle half (interquartile range)](https://aibuildindex.com/glossary/middle-half): The middle half, or interquartile range, is the span from the 25th to the 75th percentile of priced briefs, holding the central half of budgets. The AI Build Index shows it as the cost range on every page.
- [Median cost](https://aibuildindex.com/glossary/median-cost): The median cost is the middle value when all priced briefs for a build are sorted from lowest to highest budget, so half budget less and half more. It is the headline figure on each AI Build Index page.
- [Priced brief](https://aibuildindex.com/glossary/priced-brief): A priced brief is a project brief the AI Build Index can turn into a cost: a fixed-price brief with a stated budget, or an hourly brief with a rate and expected length, within the index's floor and ceiling.
- [Sample size](https://aibuildindex.com/glossary/sample-size): Sample size is the number of priced briefs behind a figure. The AI Build Index needs at least 10 to publish a page, flags pages under 15 as a small sample and suppresses table figures with fewer than 5 briefs.
