# How much does search over internal documents for engineering and architecture firms cost?

Search over internal documents for engineering and architecture firms typically costs about $4,000. Half of 15 priced briefs fall between $230 and $7,560, and one in ten reaches $9,360.

Updated 2026-11-04. Page: https://aibuildindex.com/industries/engineering/document-search-rag.

## Key points

- The median is 2.0 times the $2,000 for all AI builds in engineering and architecture.
- The median is 1.9 times the $2,150 for RAG and document search worldwide.
- Stated rates centre on $25 an hour, against $28 across the market.
- 47% of briefs ask for senior talent.
- A brief draws a median of 19.5 responses, against 12 across the market.

## What it is

Search over internal documents lets staff ask questions in plain language and get answers from company files with sources, using retrieval-augmented generation (RAG) rather than training a model.

## What drives the cost

- How many sources there are and how messy the documents are
- Permissions, which are often harder than the AI
- How accurate answers must be, which sets the testing effort

## What shapes cost in this sector

Engineering firms work with drawings, specifications and standards. Document search and estimating are common starting points, and outputs need professional review.

## Compared with

- All AI builds in engineering and architecture: $2,000
- RAG and document search worldwide: $2,150
- The whole market: $2,500

## Questions

### What is a realistic budget for search over internal documents for engineering and architecture firms?

Plan around $230 to $7,560, the middle half of 15 priced briefs. The median is $4,000.

### What hourly rate should I expect?

Stated rates centre on $25 an hour, with most between $22 and $37. These are open-market rates; agencies usually charge more.

### How does this compare with the wider market?

The median here is $4,000, against $2,000 for all AI builds in engineering and architecture and $2,500 across the market.

### Where do these numbers come from?

From 19 public project briefs published between December 2025 and November 2026. They show what buyers offered, not what was paid. Hourly briefs are estimated from rate, length and workload.

## How to read this

Figures come from public project briefs from December 2025 to November 2026 and show what buyers offered, not what was paid. Hourly briefs are estimated from rate, length and workload. Country is the buyer's stated location. A page needs 15 priced briefs, and pages under 30 stay out of search. Read small samples as a guide.
