Counting briefs shows how often buyers ask for a build. Budgeted value shows where the money goes. It adds up the budgets of every priced brief in a group, so a single large brief weighs as much as many small ones combined. The market report uses it to show which build types, budget bands and countries carry the most money, which is often a different picture from which ones are most common.
How the index uses it
Each priced brief contributes its budget: fixed-price briefs at the amount the buyer stated, and hourly briefs at their hourly estimate, calculated from rate, length and workload. The total across a group is its budgeted value.
The index then compares shares. For any slice of the market, such as a use case, a budget band or a country, it can show two numbers side by side: its share of priced briefs and its share of budgeted value. When the second is larger than the first, that slice carries more money than its volume suggests. When it is smaller, the slice is busy but low in value.
The report also uses budgeted value to measure concentration, such as how much of the total sits in the largest 10% of briefs. That links it to the top-10% idea, but from the angle of total money rather than a single cut-off.
What it means for cost
Budgeted value is a market measure, not a buyer's price. It helps answer questions such as which kinds of AI work attract the largest budgets, or whether a type of build is mostly small jobs with a few large ones. For a buyer, that context explains why quotes for some builds vary so much: when value is concentrated in a few large projects, the label covers very different scopes.
Three limits apply, all set out in the methodology:
- It is what briefs offered, not what was paid. Final contracts can differ.
- Hourly briefs are estimated with assumptions that lean towards the upper side of the market.
- Public briefs lean towards smaller, open-market projects and do not measure enterprise spending.
So budgeted value describes the open market seen through public briefs, not total spending on AI.
Common questions
Is budgeted value the same as market size?
No. It covers only the priced briefs the index collected in its window, which are public, mostly smaller projects. It says nothing about private contracts, enterprise programmes or in-house spending. Use it to compare parts of the market with each other, not to size the whole.
Why does a build type with few briefs sometimes have a large budgeted value?
Because a few large budgets can outweigh many small ones. Comparing a build's share of briefs with its share of budgeted value shows whether it is a high-volume, low-budget category or a less common one with larger projects.