The middle of the market tells a buyer what is typical. The top 10% figure tells them what ambitious looks like. It is the 90th percentile of priced briefs: nine in ten budgets for a build sit below it, one in ten above. Shown next to the median and the middle half, it gives a sense of how far the market stretches when buyers want something larger, more complex or more polished.
How the index uses it
The methodology defines the figure plainly: the band is the 25th to 75th percentile, the marker is the median, and the top-10% figure is the 90th percentile. Like the other figures, it needs at least 10 priced briefs on a page, and pages with fewer than 15 carry a small-sample note.
The index uses the 90th percentile rather than the maximum because the maximum is a single brief and can be anything: a large programme, a misread scope or an unusual one-off. The 90th percentile reflects a group of high-budget briefs, so it moves less when one large brief arrives. On a page with few priced briefs, though, it is still the most sensitive of the published figures, because only a handful of briefs sit above it.
The market report also looks at the top tenth from another angle: how much of all budgeted value sits in the largest 10% of briefs. That shows how concentrated spending is, which a median alone cannot.
What it means for cost
The gap between the median and the top 10% shows how varied a build type is. A small gap means most projects of that type are similar in size. A large gap means the label covers everything from small add-ons to substantial systems, so a buyer should look closely at what their own scope includes before deciding where it belongs.
A quote near or above the 90th percentile is not automatically too high. Builds that connect several systems, handle regulated data, need production-grade testing or use senior teams often land there. But it is a signal to ask:
- Which parts of the scope push this above most comparable budgets?
- Could a smaller first phase deliver most of the value?
- Is this priced as a production system, while comparable briefs were for pilots?
Remember that each figure is an opening budget in a public brief, and that agencies building production systems usually price above the open-market middle.
Common questions
Why not show the highest budget instead?
The single highest budget is often unrepresentative. One very large brief could make a build type look far more expensive than it is for almost everyone. The 90th percentile shows the upper end while staying grounded in a group of briefs.
What kinds of projects sit in the top 10%?
Usually those with a broader scope: more integrations, more users, stricter security or compliance, longer timelines or more senior teams. The index reports budgets, not reasons, so the brief behind a high budget is what explains it.